MILLEDGEVILLE, Baldwin County

Scenic Mountain Rv Resort

2686 IRWINTON RD MILLEDGEVILLE, GA 31061

Pool
Latest score
100
May 14, 2026
City
MILLEDGEVILLE
County
Baldwin
Inspections
9

Score history

Inspection scores over time for this facility.

Inspection history

Georgia inspection history is score-based, with violations grouped under each recorded inspection.

May 14, 2026

Re-inspection

Score: 1000 violations
No violations recorded for this inspection.

May 12, 2026

Permit/Opening

Score: 851 violation

5 - emergency phone operational and accessible

Regulation: 511-3-5-.18(10)(c ) - (c) an operable, hard-wired, conventional telephone line or continuous powered source, weatherproof emergency phone shall be permanently installed in a conspicuous location within the pool enclosure and must be readily available to bathers at all tim

15 ptsCorrected: NoRepeat: No

static on 911 phone and would not call 911

Jul 21, 2025

Routine

Score: 1000 violations
No violations recorded for this inspection.

Jun 18, 2025

Re-inspection

Score: 1000 violations
No violations recorded for this inspection.

Jun 17, 2025

Routine

Score: 804 violations

6 - proper disinfectant level

Regulation: 511-3-5-.23(5)(a) - (a) during operation, disinfectant levels are less than the minimum level specified in dph rule 511-3-5-.17. if the level of the disinfectant used is not specified in dph rule 511-3-5-.17, the disinfectant must be approved and kept at levels determin

15 ptsCorrected: NoRepeat: No

Observed chlorine levels below normal range. 511-3-5-.23(5)(a) - (a) During operation, disinfectant levels are less than the minimum level specified in DPH Rule 511-3-5-.17. If the level of the disinfectant used is not specified in DPH Rule 511-3-5-.17, the disinfectant must be approved and kept at levels determin (a) During operation, disinfectant levels are less than the minimum level specified in DPH Rule 511-3-5-.17. If the level of the disinfectant used is not specified in DPH Rule 511-3-5-.17, the disinfectant must be approved and kept at levels determined necessary by the health authority.

PIC was notified. Education was provided.

7 - ph between 7.2 and 7.8

Regulation: 511-3-5-.23(5)(b) - (b) during operation, the ph is less than the minimum or more than the maximum levels allowed in dph rule 511-3-5-.l7.

15 ptsCorrected: NoRepeat: No

Observed pH above normal range. 511-3-5-.23(5)(b) - (b) During operation, the pH is less than the minimum or more than the maximum levels allowed in DPH Rule 511-3-5-.l7. (b) During operation, the pH is less than the minimum or more than the maximum levels allowed in DPH Rule 511-3-5-.l7.

PIC was notified. Education was provided.

7 - ph between 7.2 and 7.8

Regulation: 511-3-5-.23(5)(b) - (b) during operation, the ph is less than the minimum or more than the maximum levels allowed in dph rule 511-3-5-.l7.

15 ptsCorrected: NoRepeat: No

Observed pH above normal range. 511-3-5-.23(5)(b) - (b) During operation, the pH is less than the minimum or more than the maximum levels allowed in DPH Rule 511-3-5-.l7. (b) During operation, the pH is less than the minimum or more than the maximum levels allowed in DPH Rule 511-3-5-.l7.

PIC was notified. Education was provided.

28 - flow meter: appropriate range and location

Regulation: 511-3-5-.07(4)(b) - (b) a flow meter measuring the rate of flow through the filter system with an appropriate range readable in gallons per minute (gpm) and accurate within ten percent actual flow shall be provided. the flow indicator shall be capable of measuring from

5 ptsCorrected: NoRepeat: No

Flow meter is not accurate. 511-3-5-.07(4)(b) - (b) A flow meter measuring the rate of flow through the filter system with an appropriate range readable in gallons per minute (GPM) and accurate within ten percent actual flow shall be provided. The flow indicator shall be capable of measuring from (b) A flow meter measuring the rate of flow through the filter system with an appropriate range readable in gallons per minute (GPM) and accurate within ten percent actual flow shall be provided. The flow indicator shall be capable of measuring from one-half to at least one and one-half times the design flow rate. The gauge shall be located after the filtering equipment and in such location on the return line, so as to measure the total amount of water returning to the pool according to the manufacturer’s installation specifications.

PIC was notified. Education was provided.

May 9, 2025

Permit/Opening

Score: 1000 violations
No violations recorded for this inspection.

May 8, 2025

Permit/Opening

Score: 794 violations

2 - self-closing / self-latching gates

Regulation: 511-3-5-.18(11)(h) - (h) access gates shall also comply with the requirements of this rule and shall be equipped to accommodate a locking device. barrier gates shall open away from the pool in facilities constructed after adoption of this chapter. pedestrian access gates

15 ptsCorrected: NoRepeat: No

Enclosure gate will not self close

11 - appropriate lifesaving equipment present

Regulation: 511-3-5-.18(10)(b) - (b) a minimum one-fourth inch diameter throwing rope one and one-half times the maximum width of the pool or fifty feet in length, whichever is less, to which has been firmly attached a ring buoy with an outside diameter of approximately fifteen inch

15 ptsCorrected: NoRepeat: No

No rope on the throw ring

28 - flow meter: appropriate range and location

Regulation: 511-3-5-.07(4)(b) - (b) a flow meter measuring the rate of flow through the filter system with an appropriate range readable in gallons per minute (gpm) and accurate within ten percent actual flow shall be provided. the flow indicator shall be capable of measuring from

5 ptsCorrected: NoRepeat: No

Flow meter is cracked and leaking and is not accurate

30 - deck/rinse shower maintained

Regulation: 511-3-5-.18(17) - (17) a minimum of one rinse shower shall be provided on the pool deck of all public pools and spas. water used for rinse showers may be at ambient temperature.

1 ptsCorrected: NoRepeat: No

Pool shower has broken supply line and is not operable

Jul 24, 2024

Routine

Score: 1000 violations
No violations recorded for this inspection.

Apr 5, 2024

Permit/Opening

Score: 1000 violations
No violations recorded for this inspection.