Macon, Bibb County

South Bibb Recreation Center (Splash Pad)

7035 HOUSTON RD MACON, GA 31216

Pool
Latest score
100
May 15, 2026
City
Macon
County
Bibb
Inspections
5

Score history

Inspection scores over time for this facility.

Inspection history

Georgia inspection history is score-based, with violations grouped under each recorded inspection.

May 15, 2026

Permit/Opening

Score: 1000 violations
No violations recorded for this inspection.

May 5, 2025

Permit/Opening

Score: 1000 violations
No violations recorded for this inspection.

Jul 11, 2024

Routine

Score: 991 violation

37 - other violations of the chapter

1 ptsCorrected: NoRepeat: No

Chapter 511-3-5.17(2) Chemical Values. EHS observed Calcium Hardness at 57 ppm. Violation: Calcium hardness shall be minimum of 150 ppm. Increase calcium hardness.

May 24, 2024

Permit/Opening

Score: 1000 violations
No violations recorded for this inspection.

May 24, 2024

Permit/Opening

Score: 951 violation

28 - flow meter: appropriate range and location

Regulation: 511-3-5-.07(4)(b) - (b) a flow meter measuring the rate of flow through the filter system with an appropriate range readable in gallons per minute (gpm) and accurate within ten percent actual flow shall be provided. the flow indicator shall be capable of measuring from

5 ptsCorrected: NoRepeat: No

EHS observed no flow meter . EHS advised CPO that all permitted pools must have operational flow meter at all times . 511-3-5-.07(4)(b) - (b) A flow meter measuring the rate of flow through the filter system with an appropriate range readable in gallons per minute (GPM) and accurate within ten percent actual flow shall be provided. The flow indicator shall be capable of measuring from (b) A flow meter measuring the rate of flow through the filter system with an appropriate range readable in gallons per minute (GPM) and accurate within ten percent actual flow shall be provided. The flow indicator shall be capable of measuring from one-half to at least one and one-half times the design flow rate. The gauge shall be located after the filtering equipment and in such location on the return line, so as to measure the total amount of water returning to the pool according to the manufacturer’s installation specifications.