Jan 28, 2026
Routine
16A - hot and cold water available; adequate pressure
Regulation: 511-6-1.06(1)(g),(h) - water supply, capacity; pressure (pf)
Observed insufficient hot water pressure at the male and female bathrooms (temps. 59F-74F) 511-6-1.06(1)(g),(h) - Water Supply, Capacity; Pressure (Pf) (g) Capacity.
-
The water source and system shall be of sufficient capacity to meet the peak water demands of the food service establishment. Pf
-
Hot water generation and distribution systems shall be sufficient to meet the peak hot water demands throughout the food service establishment. Pf (h) Pressure. Water under pressure shall be provided to all fixtures, equipment, and nonfood equipment that are required to use water except that water supplied as specified under subsection (1)(k)1 and 2 to a temporary food service operation or in response to a temporary interruption of a water supply need not be under pressure. Pf
Corrective action: Discussed with PIC and area manager, they will have maintenance adjust the temperature to meet the 85F minimum requirement.