May 4, 2026
Permit/Opening
50 OLYMPIC DR WAYNESBORO, GA 30830
Inspection scores over time for this facility.
Georgia inspection history is score-based, with violations grouped under each recorded inspection.
Permit/Opening
Routine
Regulation: 511-3-5-.22(9) - (9) water testing frequency. the trained operator or responsible person shall collect water samples from the water in the pool for monitoring. an in-line sampling port may be used for water held in reservoirs. the water quality testing frequency shal
no record of water conditions for today since the chemical testing kit was out of supplies. must close facility until test kit can be replenished.
Permit/Opening
Routine
Routine
Permit/Opening
Re-inspection
Routine
No chlorine was testable in the pool, the pool will be closed until further notice.
Routine
Permit/Opening