Nov 6, 2025
Routine
15B - warewashing facilities: installed, maintained, used; test strips
Regulation: 511-6-1.05(3)(h),(i),(j) - temperature measuring device, manual warewashing; sanitizing solutions, testing device (pf)
At time of inspection, the facility does not have sanitizer test strips for the three-compartment sink. Order/purchase sanitizer test strips (chlorine strips, since facility uses bleach for sanitizer solution), to ensure that sanitizer solution is at proper concentration.
17C - physical facilities installed, maintained, and clean
Regulation: 511-6-1.07(2)(c) - floor and wall junctures, coved, & enclosed or sealed, water-flushed floors provided with drains & graded to drain (c)
At time of inspection, observed a section of baseboard missing underneath the three-compartment sink. Replace baseboard.