Mar 26, 2026
Permit/Opening
180 BARNES AVE CARROLLTON, GA 30117
Inspection scores over time for this facility.
Georgia inspection history is score-based, with violations grouped under each recorded inspection.
Permit/Opening
Routine
Regulation: 511-3-5-.07(4)(b) - (b) a flow meter measuring the rate of flow through the filter system with an appropriate range readable in gallons per minute (gpm) and accurate within ten percent actual flow shall be provided. the flow indicator shall be capable of measuring from
Observed flow meter reading below 40gpm./May need maintinence
Routine
Permit/Opening
Routine
Re-inspection
Routine
Regulation: .17((1)(c) - proper disinfectant level
Free chlorine measuring at 0 ppm./corrected
Regulation: 511-3-5-.17(2) - (2) chemical values: ph
pH measured at 8.0
Permit/Opening
Routine
Regulation: 511-3-5-.06(3)(f)1. - 1. handrails, if removable, shall be installed in such a way that they cannot be removed without the use of tools.
Main entrance hand rail is loose./fully secure and tighten
Routine