May 28, 2026
Re-inspection
26 - gauge(s) in proper location; sight glass installed
Regulation: 511-3-5-.07(4)(a) - (a) a pressure or vacuum gauge or other means of indicating system condition shall be provided in the circulation system in an easily readable location.
Install effluent pressure gauge on the return line.