Permit/Opening
996 WOODBURY RD CANTON, GA 30114
Inspection scores over time for this facility.
Georgia inspection history is score-based, with violations grouped under each recorded inspection.
Permit/Opening
Routine
Regulation: 511-3-5-.19(1)(b) - (b) dressing facilities, when provided, shall be have separations for each sex with no interconnection. the rooms shall be well-lighted, drained, ventilated, and of good construction with impervious materials. they shall be developed and planned so t
Mold observed in shower area. Dressing facilities must be constructed and maintained to allow for proper sanitation per DPH Rule
Permit/Opening
Routine
Permit/Opening
Routine
Regulation: 511-3-5-.22(6) - (6) written documentation of the operator’s visits must be available at the pool facility. at a minimum, the written record must indicate the condition of the following items:
Observed no CPO logs in pump room.