May 20, 2026
Permit/Opening
26 - gauge(s) in proper location; sight glass installed
Regulation: 511-3-5-.07(4)(a) - (a) a pressure or vacuum gauge or other means of indicating system condition shall be provided in the circulation system in an easily readable location.
Install effluent pressure gauge on the return line.
37 - other violations of the chapter
Provide baby changing station in both the rest rooms.