Aug 25, 2025
Routine
12 - grab/hand rails, ladders installed and secure
Observed loose hand rail. C/A: Ensure all hand rails are secure.
3399 TOWN POINT DR KENNESAW, GA 30144-7021
Inspection scores over time for this facility.
Georgia inspection history is score-based, with violations grouped under each recorded inspection.
Routine
Observed loose hand rail. C/A: Ensure all hand rails are secure.
Permit/Opening
Regulation: 511-3-5-.07(4)(b) - (b) a flow meter measuring the rate of flow through the filter system with an appropriate range readable in gallons per minute (gpm) and accurate within ten percent actual flow shall be provided. the flow indicator shall be capable of measuring from
Observed flow meter stuck at the bottom. C/A: Ensure flow meter is replaced or repaired.
Regulation: 511-3-5-.06(3)(f)1. - 1. handrails, if removable, shall be installed in such a way that they cannot be removed without the use of tools.
Observed loose hand rail. C/A: Ensure all hand rails are secure.
Routine
Permit/Opening