Jun 9, 2026
Routine
6 - proper disinfectant level
13-189(c)(1): Stabilized chlorine must be between 3.0 - 10 ppm. Observed 12.20 ppm, CPO brought levels down to 9.70 ppm on site.
7 - ph between 7.2 and 7.8
13-189(c)(1): pH must be between 7.2 - 7.8. Observed pH at 7.0, CPO brought up to 7.2 on site.