May 15, 2025
Permit/Opening
19 - adequate turnover rate
3-190(A) - Equipment shall be operated on a 24-hour basis to obtain the minimum required one turnover every 6 hours. Observed flowmeter reading 200 GPM. Minimum turnover rate is 305 GPM.
1100 CLAIREMONT AVE DECATUR, GA 30030
Inspection scores over time for this facility.
Georgia inspection history is score-based, with violations grouped under each recorded inspection.
Permit/Opening
3-190(A) - Equipment shall be operated on a 24-hour basis to obtain the minimum required one turnover every 6 hours. Observed flowmeter reading 200 GPM. Minimum turnover rate is 305 GPM.
Permit/Opening
Routine
13-190(A) - EQUIPEMENT SHALL BE OPERATED ON A 24 HOUR BASIS TO OBTAIN THE MINIMUM REQUIRED ONE TURNOVER EVERY 6 HOURS. Observed flowmeter reading 290 GPM. Minimum turnover rate is 305 GPM.
#13-189(a)(5)-All pools shall be kept free from sediment, dirt or debris. Observed stains on the pool surface in the deepest part of the pool.
Permit/Opening
13-190(A) - EQUIPEMENT SHALL BE OPERATED ON A 24 HOUR BASIS TO OBTAIN THE MINIMUM REQUIRED ONE TURNOVER EVERY 6 HOURS. OBSERVED FLOWMETER READING ~275 GPM. MINIMUM TURNOVER IS ~305 GPM