May 5, 2026
Permit/Opening
100 RIDLEY HOWARD CT DECATUR, GA 30030
Inspection scores over time for this facility.
Georgia inspection history is score-based, with violations grouped under each recorded inspection.
Permit/Opening
Routine
Pump room must be entirely enclosed and not exposed to the elements. The public should not have access to it.
Permit/Opening
13-205(6)(1) Turnover rate is 6 hours for pool, Observed turnover rate was lower than standard based on 30000 gallons.
Routine
13-190(a): The equipment shall be operated continuously on a twenty-four (24) hour basis in order to meet required turnover rate. Flow meter not operational.
13-187(c): The operating permit shall be framed and displayed in the pool area. Current permit not displayed.
Re-inspection
13-190(a): The equipment shall be operated continuously on a twenty-four (24) hour basis in order to meet required turnover rate. Turnover rate low for size of pool.
Routine
13-189(c)(1): The free chlorine residual in all parts of the pool shall be maintained at a concentration of 3ppm and shall not exceed 10ppm. The pool was observed at 11.35ppm.
13-190(a): The equipment shall be operated continuously on a twenty-four (24) hour basis in order to meet required turnover rate. Turnover rate low for size of pool.
Permit/Opening