DECATUR, DeKalb County

CHAPEL LAKE SUBDIVISION

2600 AUTUMN LAKE LN DECATUR, GA 30034

Pool
Latest score
100
Jun 5, 2026
City
DECATUR
County
DeKalb
Inspections
8

Score history

Inspection scores over time for this facility.

Inspection history

Georgia inspection history is score-based, with violations grouped under each recorded inspection.

Jun 5, 2026

Permit/Opening

Score: 1000 violations
No violations recorded for this inspection.

Jun 16, 2025

Permit/Opening

Score: 951 violation

19 - adequate turnover rate

5 ptsCorrected: NoRepeat: No

13-190(a): The equipment shall be operated continuously on a twenty-four (24) hour basis to obtain the minimum required turnover rate. Pool was observed at 180Sch40 and should be 194Sch40.

Aug 30, 2024

Re-inspection

Score: 1000 violations
No violations recorded for this inspection.

Aug 19, 2024

Routine

Score: 763 violations

6 - proper disinfectant level

15 ptsCorrected: NoRepeat: No

13-189(c)(1): The free chlorine residual in all parts of the pool shall be maintained at a concentration no less than 3ppm and shall not exceed 10ppm. Pool was observed at 1.6ppm.

19 - adequate turnover rate

5 ptsCorrected: NoRepeat: No

13-190(a): The equipment shall be operated continuously on a twenty-four (24) hour basis to obtain the minimum required turnover rate. Pool was observed at 100GPM and should be reaching 195GPM.

32 - operator training certification available onsite and approved

4 ptsCorrected: NoRepeat: No

13-202(b): The pool operator shall be responsible for the operation of the pool and be trained in a pool operator course approved by the department. Observed no certification for pool operator. Previously informed that certification would be needed to keep pool open.

Jul 2, 2024

Routine

Score: 754 violations

6 - proper disinfectant level

15 ptsCorrected: YesRepeat: No

13-189(c)(1): The free chlorine residual in all parts of the pool shall be maintained a concentration no less then 3ppm and shall not exceed 10ppm. Pool was observed at 1.49, then corrected to 5.24.

19 - adequate turnover rate

5 ptsCorrected: NoRepeat: Yes

13-190(a): The equipment shall be operated continuously on a twenty-four (24) hour basis in order to meet the minimum required turnover rate. Flow meter observed to not be working properly. Advised to get new one.

32 - operator training certification available onsite and approved

4 ptsCorrected: NoRepeat: Yes

13-187(c): A copy of the pool operator's certificate shall be conspicuously displayed near the operating permit. Pool operator certification not available. Advised to contact pool company.

37 - other violations of the chapter

1 ptsCorrected: YesRepeat: No

13-187(c): The operating permit shall be framed and displayed in a conspicuous place at all times. Operating permit was not observed.

May 28, 2024

Permit/Opening

Score: 912 violations

19 - adequate turnover rate

5 ptsCorrected: NoRepeat: No

Required turnover rate not met.

32 - operator training certification available onsite and approved

4 ptsCorrected: NoRepeat: No

Certified pool operator's certificate not onsite.

Jul 25, 2023

Routine

Score: 951 violation

28 - flow meter: appropriate range and location

5 ptsCorrected: NoRepeat: No

13-190(a) The flow meter should be working to indicate the circulation rate. Flow meter not working at inspection.

Jun 5, 2023

Permit/Opening

Score: 1000 violations
No violations recorded for this inspection.