Jun 3, 2026
Permit/Opening
7101 CONCOURSE PKWY DOUGLASVILLE, GA 30134
Inspection scores over time for this facility.
Georgia inspection history is score-based, with violations grouped under each recorded inspection.
Permit/Opening
Routine
Regulation: 511-3-5-.22(12) - (12) a safety self-inspection shall be conducted daily by the trained operator or responsible person and documented on a log sheet.
No daily record keeping of pool chemicals
Permit/Opening
Routine
Permit/Opening
Permit/Opening
Regulation: 511-3-5-.18(11)(h) - (h) access gates shall also comply with the requirements of this rule and shall be equipped to accommodate a locking device. barrier gates shall open away from the pool in facilities constructed after adoption of this chapter. pedestrian access gates
Gate not self-closing/self latching
Regulation: 511-3-5-.17(2) - (2) chemical values: ph
pH is too high (ideal 7.4-7.6)