May 14, 2026
Permit/Opening
47 SPALDING TRL NE ATLANTA, GA 30328
Inspection scores over time for this facility.
Georgia inspection history is score-based, with violations grouped under each recorded inspection.
Permit/Opening
Permit/Opening
Regulation: 511-3-5-.07(1)(e ) - (e) water clarity shall be maintained. when standing at the pool's edge at the deep end, the main drain suction outlet covers or a four inch by four inch square marker tile in contrasting color shall be clearly visible. when standing at a spa's e
Observed cloudy water during inspection. Water clarity shall be maintained. When standing at the pool's edge at the deep end, the main drain suction outlet covers or a four inch by four inch square marker tile in contrasting color shall be clearly visible.. 1. For pools over ten feet deep an eight inch by eight inch square marker tile in a contrasting color to the pool floor shall be visible at all deepest part of the pool. 2. This reference point shall be visible at tall times from the edge of the deck.times from the edge of the deck. CA: Advised PIC to ensure water is clear and drains are clearly visible.
Regulation: 511-3-5-.17(2) - (2) chemical values: ph
The pH levels exceeded the required levels (pH 8 level). CA: advised the CPO to adjust the pH levels to the required rang of a 7.2 -7.8.
Regulation: 511-3-5-.17(1) - (1) disinfectant levels (a) free chlorine, ppm in pools not using cyanuric acid or a stabilized chlorine compound use (b),1.-5.
Observed free chlorine level at 0. Free chlorine, ppm in pools not using cyanuric acid or a stabilized chlorine compound use (b),1.-5. CPO added chlorine to pool.