Apr 23, 2026
Routine
135 HAMPTON DR CALHOUN, GA 30701
Inspection scores over time for this facility.
Georgia inspection history is score-based, with violations grouped under each recorded inspection.
Routine
Permit/Opening
Permit/Opening
Regulation: 511-3-5-.23(5)(b) - (b) during operation, the ph is less than the minimum or more than the maximum levels allowed in dph rule 511-3-5-.l7.
Observed pH taken reading lower than the minimum levels allowed at 6.7. Corrective Action: RPC notified, maintenance to use pH increaser to raise pH levels. Pool to be voluntarily closed until re-inspection.
Regulation: 511-3-5-.07(4)(b) - (b) a flow meter measuring the rate of flow through the filter system with an appropriate range readable in gallons per minute (gpm) and accurate within ten percent actual flow shall be provided. the flow indicator shall be capable of measuring from
Observed inoperable flowmeter. Corrective Action: RPC was notified, will have maintenance replace flow meter.
Routine
Regulation: 511-3-5-.06(3)(f)1. - 1. handrails, if removable, shall be installed in such a way that they cannot be removed without the use of tools.
Observed left entry handrail loose. CA: PIC and Maintenance notified. Will return on 7/22 to verify the entry handrail has been secured.
Re-inspection
Permit/Opening
Regulation: 511-3-5-.23(5)(b) - (b) during operation, the ph is less than the minimum or more than the maximum levels allowed in dph rule 511-3-5-.l7.
Observed pH taken in two different areas of the pool reading higher than the maximum levels allowed at 7.9 and 8.0. Corrective Action: employee to use pH reducer to lower pH levels. Pool to be voluntarily closed until re-inspection. Will perform re-inspection on2/25/25.
Routine
Regulation: 511-3-5-.07(4)(b) - (b) a flow meter measuring the rate of flow through the filter system with an appropriate range readable in gallons per minute (gpm) and accurate within ten percent actual flow shall be provided. the flow indicator shall be capable of measuring from
Observed inoperable flowmeter. Corrective Action: PIC was notified, will have maintenance verify flow meter is operational or replace. Will verify flow meter is operational 12/11.
Routine