Apr 22, 2026
Routine
Questions (770)963-5132 www.gnrhealth.com General Manager informed me they were booked. Rooms inspected-041, 055, 057, 127, 133, 135, 147, 149, 176, 249, 273
-
8: .15(5)General Manager was unable to provide gas-fired inspection report on-site. All gas-fired equipment shall be inspected at least annually by a qualified licensed contractor or local fire authority, if available. Points to be inspected are proper construction and installation, malfunctions and adjustments of controls and burners, faulty heat exchangers and vent obstructions. Any defects found on inspection must be corrected by a qualified heating contractor prior to use of the equipment. Upon request, the operator shall provide evidence of inspection and/or correction of any deficiency. Corrective Actions: General Manager emailed gas-fired inspection reports to me.