Aug 19, 2025
Routine
19 - adequate turnover rate
Ensure turnover every 6 hours, 75 gpm.
16 TERRACE RIDGE DR COMMERCE, GA 30529
Inspection scores over time for this facility.
Georgia inspection history is score-based, with violations grouped under each recorded inspection.
Routine
Ensure turnover every 6 hours, 75 gpm.
Permit/Opening
Routine
Regulation: 511-3-5-.07(1)(a) - (a) the equipment for a swimming pool shall be of adequate size to turn over the entire pool water capacity. the turnover rate for pools constructed after the adoption of this chapter shall not exceed the sum of one and one-half times the average wat
Unable to determine if adequate turnover is reached sue to inoperable flow meter.
Regulation: 511-3-5-.07(4)(b) - (b) a flow meter measuring the rate of flow through the filter system with an appropriate range readable in gallons per minute (gpm) and accurate within ten percent actual flow shall be provided. the flow indicator shall be capable of measuring from
Flow meter currently inoperable.
Regulation: 511-3-5-.06(3)(f)1. - 1. handrails, if removable, shall be installed in such a way that they cannot be removed without the use of tools.
Handrails in 5 foot end not secure
Permit/Opening
Routine
Regulation: 511-3-5-.06(3)(f)1. - 1. handrails, if removable, shall be installed in such a way that they cannot be removed without the use of tools.
Handrails were observed to be loose and not fully anchored to the deck; ensure all handrails are properly secured to pool deck.
Regulation: 511-3-5-.19(2)(i) - (i) soap, paper towels, and toilet tissue shall be provided in all dispensers.
No paper towels were available in the men's restroom and restroom was not clean.
Permit/Opening