Nov 24, 2025
Routine
Note: An informal inspection for gas fired equipment inspection forms will occur on or by 12/4/25. Note: Ensure that bottled water is stored off the floor. Note: Ensure that bath matts are places in the deep based tubs in the facility within 30 days. They can be replaced as often as they become damaged or uncleanable. Questions?: Call 770-784-2121 or visit www.gnrhealth.com
-
8: .15(5)Person in charge could not produce gas fired equipment records. All gas-fired equipment shall be inspected at least annually by a qualified licensed contractor or local fire authority, if available. Points to be inspected are proper construction and installation, malfunctions and adjustments of controls and burners, faulty heat exchangers and vent obstructions. Any defects found on inspection must be corrected by a qualified heating contractor prior to use of the equipment. Upon request, the operator shall provide evidence of inspection and/or correction of any deficiency.