Regulation: 511-3-5-.23(5)(a) - (a) during operation, disinfectant levels are less than the minimum level specified in dph rule 511-3-5-.17. if the level of the disinfectant used is not specified in dph rule 511-3-5-.17, the disinfectant must be approved and kept at levels determin
bserved chlorine below mininmum required rate at 0.04ppm.
.17((1)(c) - Proper disinfectant level (c) Free Chlorine level in pools using cyanuric acid or a stabilized chlorine product; Minimum 2.0 Ideal 2.0-5.0 Maximum 10.0
C/A: Pool operator added more chlorine to feeders. Pool will be retested in 24hrs.
Permit/Opening
Routine
Permit/Opening
Permit/Opening
Regulation: 511-3-5-.18(10)(c ) - (c) an operable, hard-wired, conventional telephone line or continuous powered source, weatherproof emergency phone shall be permanently installed in a conspicuous location within the pool enclosure and must be readily available to bathers at all tim
An operable, hard-wired, conventional telephone line or continuous powered source, weatherproof emergency phone shall be permanently installed in a conspicuous location within the pool enclosure and must be readily available to bathers at all times. The emergency phone shall be capable of connecting to 911 and electronically transferring an automatic number identification and automatic locator identification of the pool emergency phone to the public safety answering point, if available. A 911 sign or the names and phone numbers of the nearest available police, fire, ambulance service or rescue unit shall be posted nearby.
Routine
Regulation: 511-3-5-.07(1)(a) - (a) the equipment for a swimming pool shall be of adequate size to turn over the entire pool water capacity. the turnover rate for pools constructed after the adoption of this chapter shall not exceed the sum of one and one-half times the average wat
Observed Flow rate at 90gpm. Required Flow rate of 120gpm required to meet 6 hour turnover rate.
511-3-5-.07(1)(a) - (a) The equipment for a swimming pool shall be of adequate size to turn over the entire pool water capacity. The turnover rate for pools constructed after the adoption of this chapter shall not exceed the sum of one and one-half times the average wat (a) The equipment for a swimming pool shall be of adequate size to turn over the entire pool water capacity. The turnover rate for pools constructed after the adoption of this chapter shall not exceed the sum of one and one-half times the average water depth in feet; where the number of hours is equal to the number feet calculated, or exceed once every six hours whichever is less. Unless the rate is otherwise specified in subsection (b) below. This system shall be designed to give the proper turnover rate based on the manufacturer's recommended maximum pressure flow of the filter in dirty media condition of the filter, immediately prior to cleaning the filter.
Routine
Regulation: 511-3-5-.07(1)(a) - (a) the equipment for a swimming pool shall be of adequate size to turn over the entire pool water capacity. the turnover rate for pools constructed after the adoption of this chapter shall not exceed the sum of one and one-half times the average wat
Observed Flow rate at 85gpm. Required Flow rate of 120gpm required to meet 6 hour turnover rate.
511-3-5-.07(1)(a) - (a) The equipment for a swimming pool shall be of adequate size to turn over the entire pool water capacity. The turnover rate for pools constructed after the adoption of this chapter shall not exceed the sum of one and one-half times the average wat (a) The equipment for a swimming pool shall be of adequate size to turn over the entire pool water capacity. The turnover rate for pools constructed after the adoption of this chapter shall not exceed the sum of one and one-half times the average water depth in feet; where the number of hours is equal to the number feet calculated, or exceed once every six hours whichever is less. Unless the rate is otherwise specified in subsection (b) below. This system shall be designed to give the proper turnover rate based on the manufacturer's recommended maximum pressure flow of the filter in dirty media condition of the filter, immediately prior to cleaning the filter.
Observed calcium hardness reading at 67ppm. Minnimum required level is 150ppm.
Permit/Opening
Permit/Opening
Regulation: .17((1)(c) - proper disinfectant level
Observed chlorine below mininmum required rate at 0.34ppm.
.17((1)(c) - Proper disinfectant level (c) Free Chlorine level in pools using cyanuric acid or a stabilized chlorine product; Minimum 2.0 Ideal 2.0-5.0 Maximum 10.0
C/A: Pool operator added more chlorine to feeders. Pool will be retested in 24hrs.
Regulation: 511-3-5-.07(1)(a) - (a) the equipment for a swimming pool shall be of adequate size to turn over the entire pool water capacity. the turnover rate for pools constructed after the adoption of this chapter shall not exceed the sum of one and one-half times the average wat
Observed Flow rate at 85gpm. Required Flow rate of 120gpm required to meet 6 hour turnover rate.
511-3-5-.07(1)(a) - (a) The equipment for a swimming pool shall be of adequate size to turn over the entire pool water capacity. The turnover rate for pools constructed after the adoption of this chapter shall not exceed the sum of one and one-half times the average wat (a) The equipment for a swimming pool shall be of adequate size to turn over the entire pool water capacity. The turnover rate for pools constructed after the adoption of this chapter shall not exceed the sum of one and one-half times the average water depth in feet; where the number of hours is equal to the number feet calculated, or exceed once every six hours whichever is less. Unless the rate is otherwise specified in subsection (b) below. This system shall be designed to give the proper turnover rate based on the manufacturer's recommended maximum pressure flow of the filter in dirty media condition of the filter, immediately prior to cleaning the filter.