Jun 3, 2026
Permit/Opening
9200 LIBERTY LN LOGANVILLE, GA 30052
Inspection scores over time for this facility.
Georgia inspection history is score-based, with violations grouped under each recorded inspection.
Permit/Opening
Permit/Opening
Routine
Regulation: 511-3-5-.07(4)(b) - (b) a flow meter measuring the rate of flow through the filter system with an appropriate range readable in gallons per minute (gpm) and accurate within ten percent actual flow shall be provided. the flow indicator shall be capable of measuring from
*511-3-5-.09(1): A pump and motor shall be provided for circulation of the pool and spa water. Performance of all pumps shall meet or exceed the conditions of flow required for filtering and cleaning (if applicable) the filters against the total dynamic head developed by the complete system. Where applicable pumps shall comply with NSF International standard 50 or Underwriters Laboratories (UL) Standard 1081
Permit/Opening
Re-inspection
Routine
Regulation: 511-3-5-.17(4) - (4) stabilizer (if used) cyanuric acid,ppm ideal: 30-50 maximum: 90 comments: if stabilizer is: too high: - may reduce chlorine efficacy too low: - chlorine residual rapidly destroyed by sunlight note: stabilizer is not needed in indoor or br
Cyanuric acid exceeds 100 ppm maximum
Regulation: 511-3-5-.18(13)(c) - (c) a sign shall be posted stating the hours of operation in clear view near the entrance and shall state the theoretical peak occupancy.
Peak occupancy sign not posted