May 18, 2026
Permit/Opening
1277 RED OAK LN LOGANVILLE, GA 30052
Inspection scores over time for this facility.
Georgia inspection history is score-based, with violations grouped under each recorded inspection.
Permit/Opening
Routine
Regulation: 511-3-5-.07(1)(a) - (a) the equipment for a swimming pool shall be of adequate size to turn over the entire pool water capacity. the turnover rate for pools constructed after the adoption of this chapter shall not exceed the sum of one and one-half times the average wat
Adequate turn over rate not being met. Flow meter reading 180gpm>240gpm required
Regulation: 511-3-5-.22(9) - (9) water testing frequency. the trained operator or responsible person shall collect water samples from the water in the pool for monitoring. an in-line sampling port may be used for water held in reservoirs. the water quality testing frequency shal
Pool chemistry not being checked and logged twice daily as required
Permit/Opening
Routine
Regulation: 511-3-5-.07(1)(a) - (a) the equipment for a swimming pool shall be of adequate size to turn over the entire pool water capacity. the turnover rate for pools constructed after the adoption of this chapter shall not exceed the sum of one and one-half times the average wat
6 hour turn over rate (240 gpm) not being met at time of inspection
Regulation: 511-3-5-.22(9) - (9) water testing frequency. the trained operator or responsible person shall collect water samples from the water in the pool for monitoring. an in-line sampling port may be used for water held in reservoirs. the water quality testing frequency shal
Pool chemistry not being checked and logged twice daily as required
Permit/Opening