May 18, 2026
Permit/Opening
2019 BAY WILLOW CT MONROE, GA 30655
Inspection scores over time for this facility.
Georgia inspection history is score-based, with violations grouped under each recorded inspection.
Permit/Opening
Routine
Regulation: 511-3-5-.07(1)(a) - (a) the equipment for a swimming pool shall be of adequate size to turn over the entire pool water capacity. the turnover rate for pools constructed after the adoption of this chapter shall not exceed the sum of one and one-half times the average wat
Turnover not adequate
Regulation: 511-3-5-.22(12) - (12) a safety self-inspection shall be conducted daily by the trained operator or responsible person and documented on a log sheet.
No log kept
Routine
Regulation: 511-3-5-.22(11) - (11) if the water test results are not in compliance with dph rule 511-3-5-.17, the operator shall close the pool, record findings, and make the necessary adjustments to the water chemistry to comply with the chapter. the chemicals used and amounts s
Water test results not in compliance/ not documented
Regulation: 511-3-5-.22(12) - (12) a safety self-inspection shall be conducted daily by the trained operator or responsible person and documented on a log sheet.
Daily safety inspection not documented
Permit/Opening
Routine
Regulation: 511-3-5-.23(5)(h) - (h) absence of required lifesaving equipment on the deck or an emergency phone;
911 Call Box is not currently working. Repair/replace call box or proper phone & call Environmental Health Dept for re-inspection prior to re-opening pools
Regulation: 511-3-5-.18(10)(b) - (b) a minimum one-fourth inch diameter throwing rope one and one-half times the maximum width of the pool or fifty feet in length, whichever is less, to which has been firmly attached a ring buoy with an outside diameter of approximately fifteen inch
No 1/4" throwing rope & ring bouy available in pool area. Provide proper life-saving equipment at pool area and call Environmental Health Dept for re-inspection prior to re-opening pool
Permit/Opening