Braselton, Barrow County

Main Pool @ Inn Chateau Elan

100 RUE CHARLEMAGNE DR BRASELTON, GA 30517

Pool
Latest score
100
Apr 8, 2026
City
Braselton
County
Barrow
Inspections
6

Score history

Inspection scores over time for this facility.

Inspection history

Georgia inspection history is score-based, with violations grouped under each recorded inspection.

Apr 8, 2026

Permit/Opening

Score: 1000 violations
No violations recorded for this inspection.

Jul 22, 2025

Routine

Score: 951 violation

19 - adequate turnover rate

Regulation: 511-3-5-.07(1)(a) - (a) the equipment for a swimming pool shall be of adequate size to turn over the entire pool water capacity. the turnover rate for pools constructed after the adoption of this chapter shall not exceed the sum of one and one-half times the average wat

5 ptsCorrected: NoRepeat: No

Turnover rate not adequate. CA - Turnover rate must be 300gpm. Turnover rate is 260gpm.

Apr 14, 2025

Permit/Opening

Score: 951 violation

19 - adequate turnover rate

Regulation: 511-3-5-.07(1)(a) - (a) the equipment for a swimming pool shall be of adequate size to turn over the entire pool water capacity. the turnover rate for pools constructed after the adoption of this chapter shall not exceed the sum of one and one-half times the average wat

5 ptsCorrected: NoRepeat: Yes

Turnover rate not adequate must be 300gpm.

Jul 9, 2024

Routine

Score: 912 violations

19 - adequate turnover rate

Regulation: 511-3-5-.07(1)(a) - (a) the equipment for a swimming pool shall be of adequate size to turn over the entire pool water capacity. the turnover rate for pools constructed after the adoption of this chapter shall not exceed the sum of one and one-half times the average wat

5 ptsCorrected: NoRepeat: No

Turnover rate not adequate must be 300gpm.

32 - operator training certification available onsite and approved

Regulation: 511-3-5-.22(2) - (2) the trained operator shall have a current certificate showing completion of an approved operator training course. a copy or the original certificate or documentation shall be available onsite for inspection by the health authority.

4 ptsCorrected: NoRepeat: No

CPO certification has expired on March 27, 2024. CA - CPO is going to renew certification as soon as possible.

Apr 10, 2024

Permit/Opening

Score: 951 violation

19 - adequate turnover rate

Regulation: 511-3-5-.07(1)(a) - (a) the equipment for a swimming pool shall be of adequate size to turn over the entire pool water capacity. the turnover rate for pools constructed after the adoption of this chapter shall not exceed the sum of one and one-half times the average wat

5 ptsCorrected: NoRepeat: No

Turnover rate not adequate. Must be 300 gpm. Start daily records.

Aug 1, 2023

Routine

Score: 951 violation

19 - adequate turnover rate

Regulation: 511-3-5-.07(1)(a) - (a) the equipment for a swimming pool shall be of adequate size to turn over the entire pool water capacity. the turnover rate for pools constructed after the adoption of this chapter shall not exceed the sum of one and one-half times the average wat

5 ptsCorrected: NoRepeat: No

Turnover rate not adequate. Must be 300 gpm.