Apr 8, 2026
Permit/Opening
100 RUE CHARLEMAGNE DR BRASELTON, GA 30517
Inspection scores over time for this facility.
Georgia inspection history is score-based, with violations grouped under each recorded inspection.
Permit/Opening
Routine
Regulation: 511-3-5-.07(1)(a) - (a) the equipment for a swimming pool shall be of adequate size to turn over the entire pool water capacity. the turnover rate for pools constructed after the adoption of this chapter shall not exceed the sum of one and one-half times the average wat
Turnover rate not adequate. CA - Turnover rate must be 300gpm. Turnover rate is 260gpm.
Permit/Opening
Regulation: 511-3-5-.07(1)(a) - (a) the equipment for a swimming pool shall be of adequate size to turn over the entire pool water capacity. the turnover rate for pools constructed after the adoption of this chapter shall not exceed the sum of one and one-half times the average wat
Turnover rate not adequate must be 300gpm.
Routine
Regulation: 511-3-5-.07(1)(a) - (a) the equipment for a swimming pool shall be of adequate size to turn over the entire pool water capacity. the turnover rate for pools constructed after the adoption of this chapter shall not exceed the sum of one and one-half times the average wat
Turnover rate not adequate must be 300gpm.
Regulation: 511-3-5-.22(2) - (2) the trained operator shall have a current certificate showing completion of an approved operator training course. a copy or the original certificate or documentation shall be available onsite for inspection by the health authority.
CPO certification has expired on March 27, 2024. CA - CPO is going to renew certification as soon as possible.
Permit/Opening
Regulation: 511-3-5-.07(1)(a) - (a) the equipment for a swimming pool shall be of adequate size to turn over the entire pool water capacity. the turnover rate for pools constructed after the adoption of this chapter shall not exceed the sum of one and one-half times the average wat
Turnover rate not adequate. Must be 300 gpm. Start daily records.
Routine
Regulation: 511-3-5-.07(1)(a) - (a) the equipment for a swimming pool shall be of adequate size to turn over the entire pool water capacity. the turnover rate for pools constructed after the adoption of this chapter shall not exceed the sum of one and one-half times the average wat
Turnover rate not adequate. Must be 300 gpm.