Apr 24, 2026
Routine
8 - annual gas fired equipment inspection on file; gas units equipped with automatic safety and/or 100% cut-off pilot
Regulation: 511-6-2-.15(5) - heating and fire safety-inspection
At the time of inspection, gas-fired equipment report was not on file. PIC is scheduling inspection within 10 days
*** OBTAINED GAS FIRED EQIUPMENT REPORT ON 4/28/26 ***
28 - beds, mattresses, mattress pads, springs, frames, pillows, and bed coverings clean; vermin free and in good condition; bed linen properly supplied, changed and laundered
Regulation: 511-6-2-.14(6) - bed, bedding, and linens
At time of inspection, observed stained mattress pads in all rooms. There was a stained pillow in room 211.// Replace linens as needed