Kingsland, Camden County

Mariners Landing Pool

101 MARINERS DR KINGSLAND, GA 31548

Pool
Latest score
100
Mar 12, 2026
City
Kingsland
County
Camden
Inspections
8

Score history

Inspection scores over time for this facility.

Inspection history

Georgia inspection history is score-based, with violations grouped under each recorded inspection.

Mar 12, 2026

Permit/Opening

Score: 1000 violations
No violations recorded for this inspection.

Oct 14, 2025

Routine

Score: 942 violations

21 - cyanuric acid level not exceeding maximum

Regulation: 511-3-5-.17(4) - (4) stabilizer (if used) cyanuric acid,ppm ideal: 30-50 maximum: 90 comments: if stabilizer is: too high: - may reduce chlorine efficacy too low: - chlorine residual rapidly destroyed by sunlight note: stabilizer is not needed in indoor or br

4 ptsCorrected: NoRepeat: No

At time of inspection, the cyanuric acid (CYA) level registered at 111 ppm (CYA must be 90 ppm or less). CPO will drain some water and add some fresh water.

22 - signs: peak occupancy/pool/spa/signs legible and in clearview

Regulation: 511-3-5-.18(13)(c) - (c) a sign shall be posted stating the hours of operation in clear view near the entrance and shall state the theoretical peak occupancy.

2 ptsCorrected: NoRepeat: No

At time of inspection, the peak occupancy and hours of operation signs are missing. CPO will order the signs and install them ASAP.

Apr 22, 2025

Re-inspection

Score: 961 violation

13 - float line in position

Regulation: 511-3-5-.18(2) - (2) rope and float line. a rope and float line shall be provided within one foot of and on the shallow side of the break in grade between the shallow and deep portions of the swimming pool, with its position marked with visible floats at intervals of

4 ptsCorrected: NoRepeat: No

The float line is missing. CPO will replace the float line.

Apr 17, 2025

Permit/Opening

Score: 812 violations

5 - emergency phone operational and accessible

Regulation: 511-3-5-.18(10)(c ) - (c) an operable, hard-wired, conventional telephone line or continuous powered source, weatherproof emergency phone shall be permanently installed in a conspicuous location within the pool enclosure and must be readily available to bathers at all tim

15 ptsCorrected: NoRepeat: No

At time of inspection, the emergency phone is not operational (no sound, appears to be no power to it). The emergency phone must be operational before the pool can re-open. Pool must pass re-inspection before re-opening.

13 - float line in position

Regulation: 511-3-5-.18(2) - (2) rope and float line. a rope and float line shall be provided within one foot of and on the shallow side of the break in grade between the shallow and deep portions of the swimming pool, with its position marked with visible floats at intervals of

4 ptsCorrected: NoRepeat: No

At time of inspection, the float line is broken. CPO will replace the float line.

Oct 16, 2024

Re-inspection

Score: 1000 violations
No violations recorded for this inspection.

Oct 11, 2024

Re-inspection

Score: 851 violation

5 - emergency phone operational and accessible

Regulation: 511-3-5-.18(10)(c ) - (c) an operable, hard-wired, conventional telephone line or continuous powered source, weatherproof emergency phone shall be permanently installed in a conspicuous location within the pool enclosure and must be readily available to bathers at all tim

15 ptsCorrected: NoRepeat: Yes

At time of follow-up inspection, the emergency phone is not operational. Management contacted TDS (phone company) to come back out. CPO will notify EHS, once the phone is operational, to schedule re-inspection.

Oct 8, 2024

Routine

Score: 812 violations

5 - emergency phone operational and accessible

Regulation: 511-3-5-.18(10)(c ) - (c) an operable, hard-wired, conventional telephone line or continuous powered source, weatherproof emergency phone shall be permanently installed in a conspicuous location within the pool enclosure and must be readily available to bathers at all tim

15 ptsCorrected: NoRepeat: Yes

At time of inspection, the emergency phone is not functioning. CPO contacted Management and they will troubleshoot the phone.

13 - float line in position

Regulation: 511-3-5-.18(2) - (2) rope and float line. a rope and float line shall be provided within one foot of and on the shallow side of the break in grade between the shallow and deep portions of the swimming pool, with its position marked with visible floats at intervals of

4 ptsCorrected: NoRepeat: No

At time of inspection, there is no float line present. CPO will install a float line (CPO has ordered a float line).

Apr 19, 2024

Permit/Opening

Score: 851 violation

5 - emergency phone operational and accessible

Regulation: 511-3-5-.18(10)(c ) - (c) an operable, hard-wired, conventional telephone line or continuous powered source, weatherproof emergency phone shall be permanently installed in a conspicuous location within the pool enclosure and must be readily available to bathers at all tim

15 ptsCorrected: YesRepeat: No

At time of inspection, emergency phone was not operational. Corrected on-site (COS): HOA rep. brought a spare phone and installed it. Phone was operational before conclusion of inspection.