May 12, 2026
Permit/Opening
201 POWERS PASS BLOOMINGDALE, GA 31302
Inspection scores over time for this facility.
Georgia inspection history is score-based, with violations grouped under each recorded inspection.
Permit/Opening
Permit/Opening
Re-inspection
Permit/Opening
Regulation: 511-3-5-.18(11)(h) - (h) access gates shall also comply with the requirements of this rule and shall be equipped to accommodate a locking device. barrier gates shall open away from the pool in facilities constructed after adoption of this chapter. pedestrian access gates
Observed gate unable to self close.
RCA: Access gates shall also comply with the requirements of this Rule and shall be equipped to accommodate a locking device. Barrier gates shall open away from the pool in facilities constructed after adoption of this chapter. Pedestrian access gates shall be self-closing and have a self-latching device. Gates other than pedestrian access gates shall have a self-latching device. Where the release mechanism of the self latching device is located less than fifty-four inches from the bottom of the gate, 1. The release mechanism shall be located on the pool side of the gate at least three inches below the top of the gate and 2. Any openings in the gate or barrier located within eighteen inches of the release mechanism shall be less than one-half inch. 3. Mechanisms controlled by an access card reader, key entry device or keypad shall be located on the outside of the access gate.
Regulation: 511-3-5-.17(2) - (2) chemical values: ph
Observed pH value at 8.
RCA: pH shall be between 7.2-7.8