Mar 3, 2026
Routine
4832 HWY 92 APT 1109 ACWORTH, GA 30102
Inspection scores over time for this facility.
Georgia inspection history is score-based, with violations grouped under each recorded inspection.
Routine
Routine
Regulation: 511-3-5-.07(1)(a) - (a) the equipment for a swimming pool shall be of adequate size to turn over the entire pool water capacity. the turnover rate for pools constructed after the adoption of this chapter shall not exceed the sum of one and one-half times the average wat
Observed flowmeter not working. Must replace the flowmeter.
Regulation: 511-3-5-.22(12) - (12) a safety self-inspection shall be conducted daily by the trained operator or responsible person and documented on a log sheet.
Must check pH and chlorine twice a day and the logs must be maintained onsite.
Regulation: 511-3-5-.17(4) - (4) stabilizer (if used) cyanuric acid,ppm ideal: 30-50 maximum: 90 comments: if stabilizer is: too high: - may reduce chlorine efficacy too low: - chlorine residual rapidly destroyed by sunlight note: stabilizer is not needed in indoor or br
Cyanuric acid is greater than 100ppm. Must be below 90ppm.
Regulation: 511-3-5-.07(4)(a) - (a) a pressure or vacuum gauge or other means of indicating system condition shall be provided in the circulation system in an easily readable location.
Must effluent pressure gauge on the return line.
Regulation: 511-3-5-.22(5) - (5) the trained operator must perform a minimum of two visits weekly and be able to provide assistance whenever needed.
CPO must check everything twice a week and the logs must be maintained onsite.
Must provide extra set of cartridge filters.
Routine
Regulation: 511-3-5-.22(12) - (12) a safety self-inspection shall be conducted daily by the trained operator or responsible person and documented on a log sheet.
Must check pH and chlorine twice a day and the logs must be maintained onsite.
Regulation: 511-3-5-.22(5) - (5) the trained operator must perform a minimum of two visits weekly and be able to provide assistance whenever needed.
CPO must check everything twice a week and the logs must be maintained onsite.
Re-inspection
Routine
Regulation: .17((1)(c) - proper disinfectant level
Chlorine is very high. Must be between 2 and 10ppm.
Regulation: 511-3-5-.07(1)(b) - (b) turnover rates for pools by type listed below: type
Glow is at 90gpm. Must be 134gpm.
Regulation: 511-3-5-.22(12) - (12) a safety self-inspection shall be conducted daily by the trained operator or responsible person and documented on a log sheet.
Must check pH and chlorine twice a day and the logs must be maintained onsite.
Regulation: 511-3-5-.17(4) - (4) stabilizer (if used) cyanuric acid,ppm ideal: 30-50 maximum: 90 comments: if stabilizer is: too high: - may reduce chlorine efficacy too low: - chlorine residual rapidly destroyed by sunlight note: stabilizer is not needed in indoor or br
Cyanuric acid is greater than 100ppm. Must be below 90ppm.
Regulation: 511-3-5-.22(2) - (2) the trained operator shall have a current certificate showing completion of an approved operator training course. a copy or the original certificate or documentation shall be available onsite for inspection by the health authority.
Must post a copy of the CPO Certificate.
Regulation: 511-3-5-.22(5) - (5) the trained operator must perform a minimum of two visits weekly and be able to provide assistance whenever needed.
CPO must check everything twice a week and the logs must be maintained onsite.
Must fix the leak in the pump room.
Permit/Opening
Regulation: 511-3-5-.06(3)(f)1. - 1. handrails, if removable, shall be installed in such a way that they cannot be removed without the use of tools.
Handrails must be able to reach to the bottom step. Placed an order. By May 10, 2024, it should be installed.