May 6, 2026
Permit/Opening
26 - gauge(s) in proper location; sight glass installed
Regulation: 511-3-5-.07(4)(a) - (a) a pressure or vacuum gauge or other means of indicating system condition shall be provided in the circulation system in an easily readable location.
Must install effluent pressure gauge on the return line.
37 - other violations of the chapter
Must install diaper changing stations in both the restrooms.