Mar 26, 2026
Permit/Opening
3105 GADDIS RD CANTON, GA 30115
Inspection scores over time for this facility.
Georgia inspection history is score-based, with violations grouped under each recorded inspection.
Permit/Opening
Routine
Regulation: 511-3-5-.07(1)(a) - (a) the equipment for a swimming pool shall be of adequate size to turn over the entire pool water capacity. the turnover rate for pools constructed after the adoption of this chapter shall not exceed the sum of one and one-half times the average wat
Observed a turnover rate of 180 GPM. Must be 325 GPM or higher.
Regulation: 511-3-5-.06(3)(f)1. - 1. handrails, if removable, shall be installed in such a way that they cannot be removed without the use of tools.
Observed broken ladder under hand rail. Must fix.
Permit/Opening
Regulation: 511-3-5-.07(1)(a) - (a) the equipment for a swimming pool shall be of adequate size to turn over the entire pool water capacity. the turnover rate for pools constructed after the adoption of this chapter shall not exceed the sum of one and one-half times the average wat
Observed a turnover rate of 250 GPM. The required turnover rate for this pool is 325 GPM.
Routine
Regulation: 511-3-5-.07(1)(b) - (b) turnover rates for pools by type listed below: type
Observed a turnover rate of 190 GPM. The required turnover rate for this pool is 325 GPM.
Regulation: 511-3-5-.11(3)(d) - (d) each skimmer shall have a weir that adjusts automatically to variations in water level over a minimum range of four inches.
Observed several skimmers missing weirs. Must install weirs.
Permit/Opening
Routine
Regulation: 511-3-5-.07(1)(b) - (b) turnover rates for pools by type listed below: type
Flow meter is reading around 225 gpm. The turnover rate for this pool is 325 gpm.