May 13, 2026
Permit/Opening
150 SPRING CT ATHENS, GA 30601
Inspection scores over time for this facility.
Georgia inspection history is score-based, with violations grouped under each recorded inspection.
Permit/Opening
Routine
Permit/Opening
Permit/Opening
Regulation: .17((1)(c) - proper disinfectant level
Chlorine level below 2-10ppm range.
Re-inspection
Regulation: .17((1)(c) - proper disinfectant level
Maintain chlorine concentration at 2-10ppm free.
Regulation: 511-3-5-.17(1) - (1) disinfectant levels (a) free chlorine, ppm in pools not using cyanuric acid or a stabilized chlorine compound use (b),1.-5.
Reduce combined chlorine to below 0.4ppm.
Have pool designed for 911 phone location.
Permit/Opening
Regulation: .17((1)(c) - proper disinfectant level
Chlorine concentration at 0.5 ppm - must be maintained at 2-10 ppm.
Regulation: 511-3-5-.07(4)(b) - (b) a flow meter measuring the rate of flow through the filter system with an appropriate range readable in gallons per minute (gpm) and accurate within ten percent actual flow shall be provided. the flow indicator shall be capable of measuring from
Flow meter stuck - not operating.
Regulation: .06(3)(e) - markings
Spray paint "NO DIVING" along each pool edge in 4 inch lettering.
Peak Occupancy sign required - 71 occupants.