Apr 17, 2026
Permit/Opening
26 - gauge(s) in proper location; sight glass installed
Regulation: 511-3-5-.09(9)(b) - (b) the pressure gauge shall be installed downstream from the pump, on the face piping ahead of the filter or on top of the filter in the area of greatest filter pressure.
Observed, in the pump room, pressure gauge inoperable and in disrepair. Advised PIC/CPO that the pressure gauge shall be installed downstream from the pump on the face piping ahead of the filter or on top of the filter in the area of the greatest filter pressure. COS: CPO repaired pressure gauge.