Newnan, Coweta County

Springhill Suites

1119 BULLSBORO DR NEWNAN, GA 30265

Pool
Latest score
100
Apr 20, 2026
City
Newnan
County
Coweta
Inspections
5

Score history

Inspection scores over time for this facility.

Inspection history

Georgia inspection history is score-based, with violations grouped under each recorded inspection.

Apr 20, 2026

Permit/Opening

Score: 1000 violations
No violations recorded for this inspection.

Aug 13, 2025

Routine

Score: 893 violations

28 - flow meter: appropriate range and location

Regulation: 511-3-5-.07(4)(b) - (b) a flow meter measuring the rate of flow through the filter system with an appropriate range readable in gallons per minute (gpm) and accurate within ten percent actual flow shall be provided. the flow indicator shall be capable of measuring from

5 ptsCorrected: NoRepeat: No

Observed flow meter not operating at the time of inspection.

36 - daily recordkeeping: water testing and self inspection performed

Regulation: 511-3-5-.22(9) - (9) water testing frequency. the trained operator or responsible person shall collect water samples from the water in the pool for monitoring. an in-line sampling port may be used for water held in reservoirs. the water quality testing frequency shal

5 ptsCorrected: NoRepeat: No

Observed pH and Free Chlorine levels only measured once a day. Reading shall be taken twice daily.

37 - other violations of the chapter

1 ptsCorrected: NoRepeat: No

Observed calcium hardness measuring below minimum acceptable level.

Jun 2, 2025

Permit/Opening

Score: 991 violation

30 - deck/rinse shower maintained

Regulation: 511-3-5-.18(17) - (17) a minimum of one rinse shower shall be provided on the pool deck of all public pools and spas. water used for rinse showers may be at ambient temperature.

1 ptsCorrected: NoRepeat: No

Deck shower inoperable at time of inspection.

Aug 15, 2023

Routine

Score: 835 violations

19 - adequate turnover rate

Regulation: 511-3-5-.07(1)(a) - (a) the equipment for a swimming pool shall be of adequate size to turn over the entire pool water capacity. the turnover rate for pools constructed after the adoption of this chapter shall not exceed the sum of one and one-half times the average wat

5 ptsCorrected: NoRepeat: No

Observed flow meter looking broken and just sitting at the bottom. Flow meter should read 53 gpm or higher for adequate turnover.

36 - daily recordkeeping: water testing and self inspection performed

Regulation: 511-3-5-.22(9) - (9) water testing frequency. the trained operator or responsible person shall collect water samples from the water in the pool for monitoring. an in-line sampling port may be used for water held in reservoirs. the water quality testing frequency shal

5 ptsCorrected: NoRepeat: No

Observed no tests being performed twice daily.

35 - operator facility inspections performed; written documentation

Regulation: 511-3-5-.22(6) - (6) written documentation of the operator’s visits must be available at the pool facility. at a minimum, the written record must indicate the condition of the following items:

4 ptsCorrected: NoRepeat: No

No written documentation showing CPO was testing/visiting twice weekly.

22 - signs: peak occupancy/pool/spa/signs legible and in clearview

Regulation: 511-3-5-.18(12)(c) - (c) the same sign in subsection (b) above or an additional sign will state under the heading “pool risks” the following items in clearly legible letters at least one inch high:

2 ptsCorrected: NoRepeat: Yes

The sign stated peak occupancy was 65. It should be 52 or less.

37 - other violations of the chapter

1 ptsCorrected: NoRepeat: No

Observed calcium hardness below minimum.

Jun 23, 2023

Routine

Score: 981 violation

22 - signs: peak occupancy/pool/spa/signs legible and in clearview

Regulation: 511-3-5-.18(13)(c) - (c) a sign shall be posted stating the hours of operation in clear view near the entrance and shall state the theoretical peak occupancy.

2 ptsCorrected: NoRepeat: No

The sign stated peak occupancy was 65. It should be 52 or less.