Jun 3, 2026
Routine
19 - adequate turnover rate
13-190(a): The equipment shall be operated continuously on a 24 hour basis to obtain the minimum required number of 1 turnover every 6 hours for standard pools. Turnover rate was low. Flow meter read 80 gpm instead of required 111.11 gpm.
15 - depth and no diving markers, step marking; installed and contrasting
13-188(d)(2): At the shallow portions of the pool or where depths are five feet (5') or less shall have permanent "No Diving" in minimum two inch (2") black letters with white background spaced evenly around the pool perimeter located next to depth markers within 18 inches (18") of pool wall. "No Diving" symbol can only be used in conjunction with words. No Diving tiles must be placed with 2" black letters before next pool season or no permit will be issued. No Diving was sprayed on.
32 - operator training certification available onsite and approved
13-187(c): A copy of the pool operator's certificate shall be conspicuously displayed near the operating permit. Certificate was locked in pump room. CPO placed it in window when advised.
22 - signs: peak occupancy/pool/spa/signs legible and in clearview
13-202(m): No peak occupancy posted upon arrival. CPO wrote it in after advised.