Jun 1, 2026
Routine
19 - adequate turnover rate
13-205(b)(1) equipment shall be ran to achieve one turnover every 6 hours. The current flow rate is at 75 GPM, the required rate is 167 GPM
36 - daily recordkeeping: water testing and self inspection performed
13-189(c)(4) pool water shall be tested for the disinfectant level and pH at least 2 times per day. Current logs have not been recorded since May 11
20 - return inlets maintained
13-190(a) return inlets shall function properly and be maintained. There is currently one missing return inlet cover
37 - other violations of the chapter
13-202(k) first aid kit must be mounted in a conspicuous location in the pool area. The first aid kit is currently locked in the equipment room
37 - other violations of the chapter
13-188(n)(9) 1 lined trash can shall be provided and placed in the pool area. The current trash cans have no liners present