Eastman, Dodge County

AZ Operator,LLC D.B.A. Heart of Georgia Nursing Home

815 LEGION DR EASTMAN, GA 31023

Food
Latest score
100
Nov 6, 2025
City
Eastman
County
Dodge
Inspections
6

Score history

Inspection scores over time for this facility.

Inspection history

Georgia inspection history is score-based, with violations grouped under each recorded inspection.

Nov 6, 2025

Routine

Score: 1000 violations
No violations recorded for this inspection.

May 22, 2025

Routine

Score: 1000 violations
No violations recorded for this inspection.

Oct 17, 2024

Routine

Score: 1000 violations
No violations recorded for this inspection.

Jun 14, 2024

Routine

Score: 1000 violations
No violations recorded for this inspection.

Jan 23, 2024

Followup

Score: 991 violation

15A - food and nonfood-contact surfaces cleanable, properly designed, constructed, and used

Regulation: 511-6-1.05(2)(u) - condenser unit, separation (c)

1 ptsCorrected: NoRepeat: No

Walk in cooler was not working. All food had been removed from unit. parts are on order --- Condenser is bad.

Dec 28, 2023

Routine

Score: 783 violations

3-1B - food received at proper temperature

Regulation: 511-6-1.04(3)(a) - temperature (p, pf)

9 ptsCorrected: NoRepeat: No

Received food shipment from US foods, however while watching staff they were dating and checking against receiving list, but not checking food temperatures upon arrival. Egg liquid 39 Turkey sausage 38 Vegetables frozen 34

6-1B - proper hot holding temperatures

Regulation: 511-6-1.04(6)(f) - time/temperature control for safety; hot holding (p)

9 ptsCorrected: NoRepeat: No

Hot hold temperatures are not meeting proper minimum hot hold requirements at 135 deg f. Temperatures ranged on chicken patties at 107-109 to blended chicken at 116. Staff removed items from hot wells to reheat.

4-2B - food-contact surfaces: cleaned & sanitized

Regulation: 511-6-1.05(7)(a)1 - equipment, food-contact surfaces,& utensils (pf)

4 ptsCorrected: NoRepeat: No

Observed bulk ice machine interior ice chute and plating and nozzles at sparling water machine had build up of mold and debris. Items need to be cleaned more frequently to stop build up.