Jun 1, 2026
Permit/Opening
1 CROSSGATE WAY GUYTON, GA 31312
Inspection scores over time for this facility.
Georgia inspection history is score-based, with violations grouped under each recorded inspection.
Permit/Opening
Permit/Opening
Regulation: 511-3-5-.18(11)(h) - (h) access gates shall also comply with the requirements of this rule and shall be equipped to accommodate a locking device. barrier gates shall open away from the pool in facilities constructed after adoption of this chapter. pedestrian access gates
Observed gate that would not close on its own
Observed life preserver with dry rot on the rope
Regulation: 511-3-5-.11(3)(d) - (d) each skimmer shall have a weir that adjusts automatically to variations in water level over a minimum range of four inches.
Observed skimmer with broken weir
Routine
Regulation: 511-3-5-.17(4) - (4) stabilizer (if used) cyanuric acid,ppm ideal: 30-50 maximum: 90 comments: if stabilizer is: too high: - may reduce chlorine efficacy too low: - chlorine residual rapidly destroyed by sunlight note: stabilizer is not needed in indoor or br
Observed cyanuric acid level reading 112ppm, above the maximum of 90ppm
Permit/Opening
Permit/Opening
Permit/Opening
Re-inspection
Routine
Regulation: .17((1)(c) - proper disinfectant level
Observed chlorine at .68 ppm, lower than the required minimum 2.0 ppm.
Regulation: 511-3-5-.17(2) - (2) chemical values: ph
Observed pH at 7.9 ppm, higher than the required maximum 7.8 ppm.
Observed calcium hardness at 54 ppm, lower than the required minimum 150 ppm.