Jun 2, 2026
Routine
17C - physical facilities installed, maintained, and clean
Regulation: 511-6-1.07(5)(a),(b) - good repair, physical facilities maintained; cleaning, frequency & restrictions, cleaned often enough to keep them clean (c)
Things to work on over the next 6 months: Repair any missing floor tiles. Flooring in WIC should be sealed and not water should ever be standing. Repair walls in WIC. Continue repairing/replacing ceiling tiles throughout the kitchen and dining area.