Apr 20, 2026
Permit/Opening
40 CHATEAU DR ROME, GA 30162
Inspection scores over time for this facility.
Georgia inspection history is score-based, with violations grouped under each recorded inspection.
Permit/Opening
Re-inspection
Routine
Regulation: .17((1)(c) - proper disinfectant level
Observed Free Chlorine level below minimum level for Georgia DPH Rules and Regulations 2ppm for stabilized pools. CA: Discussed FCL level with CPO COS: Pool is voluntarily closed and pool to be re-checked by health dept. within 24 hours.
Regulation: 511-3-5-.07(4)(b) - (b) a flow meter measuring the rate of flow through the filter system with an appropriate range readable in gallons per minute (gpm) and accurate within ten percent actual flow shall be provided. the flow indicator shall be capable of measuring from
Observed flow meter not working. CA: discussed having flow meter repaired with CPO COS: Flow meter to be repaired and re-checked by health dept within 24 hours.
Regulation: 511-3-5-.17(4) - (4) stabilizer (if used) cyanuric acid,ppm ideal: 30-50 maximum: 90 comments: if stabilizer is: too high: - may reduce chlorine efficacy too low: - chlorine residual rapidly destroyed by sunlight note: stabilizer is not needed in indoor or br
Observed CYA level higher than the maximum level allowed by Georgia DPH Rules and Regulations. CA: Discussed high level of stabilizer with CPO and maintenance of pool. COS: Pool stabilizer will be decreased to proper levels and re-checked in 24 hours.
Permit/Opening
Routine
Regulation: 511-3-5-.17(4) - (4) stabilizer (if used) cyanuric acid,ppm ideal: 30-50 maximum: 90 comments: if stabilizer is: too high: - may reduce chlorine efficacy too low: - chlorine residual rapidly destroyed by sunlight note: stabilizer is not needed in indoor or br
Observed CYA levels higher than 90 ppm CA: Discussed CYA levels with CPO-CPO levels will be re-checked by 7/30/24
Permit/Opening
Routine