Jun 6, 2025
Re-inspection
905 BUFORD RD CUMMING, GA 30041
Inspection scores over time for this facility.
Georgia inspection history is score-based, with violations grouped under each recorded inspection.
Re-inspection
Re-inspection
Regulation: 511-3-5-.17(2) - (2) chemical values: ph
The pH measured 7.0. Advised PIC that the pH shall measure 7.2-7.8.
Permit/Opening
Regulation: 511-3-5-.23(5)(b) - (b) during operation, the ph is less than the minimum or more than the maximum levels allowed in dph rule 511-3-5-.l7.
Inspector measured and observed pH greater than 8.0ppm. Advised PIC that the pH shall measure 7.2-7.8ppm.
Regulation: 511-3-5-.18(12)(a) - (a) the words "no diving" and the universal international symbol for “no diving” shall be permanently visible at the edge of the deck for water five feet in depth or less, placed only on the deck beside the depth markers, and shall conform to that ou
There are not any universal international symbols for no diving placed on the deck edge. Advised PIC that the universal international symbols shall be placed permanently at the edge of the deck by the depth markers. COS PIC will order the no diving symbols
Permit/Opening
Regulation: 511-3-5-.18(12)(b) - (b) where no lifeguard is on duty, a sign or signs shall be placed in clear view at or near the entrance to the pool and shall state in clearly legible letters at least four inches high “warning - no life guard on duty and risk of drowning - supervis
The "no lifeguard..." sign is not posted. Advised PIC that a sign stating "Warning - No Life Guard on Duty and Risk of Drowning- Supervise Children Closely" needs to be posted where no lifeguard is on duty. COS PIC states that they have the sign and will be posted.
Regulation: 511-3-5-.18(12)(c) - (c) the same sign in subsection (b) above or an additional sign will state under the heading “pool risks” the following items in clearly legible letters at least one inch high:
The pool risks sign that is posted does not contain at least the 10 risks listed in the rule. Advised PIC that the pool risk sign needs to state at least all 10 of the pool risks stated in the swimming pool rule. COS PIC stated that she will order an updated pool risks sign and will take several weeks to receive it. Once received, the sign will be posted.
Regulation: 511-3-5-.18(12)(a) - (a) the words "no diving" and the universal international symbol for “no diving” shall be permanently visible at the edge of the deck for water five feet in depth or less, placed only on the deck beside the depth markers, and shall conform to that ou
There are not any universal international symbols for no diving placed on the deck edge. Advised PIC that the universal international symbols shall be placed permanently at the edge of the deck by the depth markers. COS PIC will order the no diving symbols