Feb 20, 2026
Routine
1-2B - certified food protection manager
Regulation: 511-6-1.03(3)(c) - certification documentation (pf)
Observed no Certification Documentation for Food Safety Manager in the Establishment. CA: Advised PIC to post CFSM Certificate.
1-2B - certified food protection manager
Regulation: 511-6-1.03(3)(a) - food safety manager certification (pf)
PIC could not provide proof of up-to-date CFSM Certificate. CA: Advised PIC to obtain CFSM Certificate.
4-2A - food stored covered
Regulation: 511-6-1.04(4)(c)1(iv) - packaged & unpackaged food, food stored covered(c)
Observed uncovered marinara sauce, pepperoni, mushrooms, and bell peppers in the prep top cooler in the main kitchen. Also, observed uncovered partially cooked chicken in the main kitchen.
12B - personal cleanliness
Regulation: 511-6-1.03(5)(j) - hair restraints (c)
Observed no hairnets in usage.
18 - insects, rodents, and animals not present
Regulation: 511-6-1.07(5)(k) - controlling pests (pf, c)
Observed conditions in the main kitchen that can be conducive for pest harbourage. CA: Advised PIC to ensure food and non-food waste are placed in the appropriate locations to prevent pest harbourage.
15B - warewashing facilities: installed, maintained, used; test strips
Regulation: 511-6-1.05(3)(h),(i),(j) - temperature measuring device, manual warewashing; sanitizing solutions, testing device (pf)
Observed no test strips for sani-bucket and 3-comp sink. CA: Advised PIC to obtain test strips in order to accurately make sani-bucket and 3-comp sink.
17C - physical facilities installed, maintained, and clean
Regulation: 511-6-1.07(5)(f) - drying mops (c)
Observed mop not hung in a position that would allow it to air dry. CA: Advised PIC to obtain hooks to hang mops in order for them to dry appropriately.
17C - physical facilities installed, maintained, and clean
Regulation: 511-6-1.07(5)(a),(b) - good repair, physical facilities maintained; cleaning, frequency & restrictions, cleaned often enough to keep them clean (c)
Observed debris build up on the floors and walls. CA: Advised PIC to perform a deep clean of the main kitchen to remove build up.