Jan 27, 2026
Routine
8 - annual gas fired equipment inspection on file; gas units equipped with automatic safety and/or 100% cut-off pilot
Regulation: 511-6-2-.15(5) - heating and fire safety-inspection
No gas fired equipment inspection available fore review. CA: All gas-fired equipment shall be inspected at least annually by a qualified licensed contractor or local fire authority, if available. Points to be inspected are proper construction and installation, malfunctions and adjustments of controls and burners, faulty heat exchangers and vent obstructions. Any defects found on inspection must be corrected by a qualified heating contractor prior to use of the equipment. Upon request, the operator shall provide evidence of inspection and/or correction of any deficiency.
Going to call Middle GA Plumbing that did the inspection in 7/29/2024 and see if they can either find the inspection report for 2025, or have them do another inspection. Will call or email me with update
28 - beds, mattresses, mattress pads, springs, frames, pillows, and bed coverings clean; vermin free and in good condition; bed linen properly supplied, changed and laundered
Regulation: 511-6-2-.14(6) - bed, bedding, and linens
Multiple rooms have bed coverings (bed bug covers and mattress covers) that are stained. The rooms were 114, 214 and 231. CA: All bed coverings shall be maintained clean. House keeping has been notified and they are going to change the sheets that are stained