Jul 10, 2025
Routine
19 - adequate turnover rate
Regulation: 511-3-5-.07(1)(a) - (a) the equipment for a swimming pool shall be of adequate size to turn over the entire pool water capacity. the turnover rate for pools constructed after the adoption of this chapter shall not exceed the sum of one and one-half times the average wat
Turnover rate at 80 GPH>>bring up to minimum of 166 GPH
32 - operator training certification available onsite and approved
Regulation: 511-3-5-.22(2) - (2) the trained operator shall have a current certificate showing completion of an approved operator training course. a copy or the original certificate or documentation shall be available onsite for inspection by the health authority.
No CPO Certificate submitted or onsite