Oct 2, 2023
Complaint Full
Inspection Completed - No Further Action
High Priority: 1Basic: 1Total: 2
27-13-4
Basic - Condensation or other drainage not disposed of properly and/or causing sanitary nuisance. Ac drains in channels between cement. Some of those channels are blocked by garbage,roots etc. need to be cleaned out.
19-04-4
Basic - Faucet leaking/constantly dripping. In front of units 521,523.
25-01-4
Basic - Trash/debris on the ground. Three story building- plastic bags in shrubs, cement floors soiled with dirt and debris.