Nov 3, 2025
Permit/Opening
26 - gauge(s) in proper location; sight glass installed
Regulation: 511-3-5-.08(5) - (5) a sight glass shall be installed on the waste discharge line of pressure filters so that the progress of filter washing can be observed.
Observed pressure gauge broken and unable to be read. RCA: A pressure or vacuum gauge or other means of indicating system condition shall be provided in the circulation system in an easily readable location.
RCA: 511-3-5-.08(5) - (5) A sight glass shall be installed on the waste discharge line of pressure filters so that the progress of filter washing can be observed. (5) A sight glass shall be installed on the waste discharge line of pressure filters so that the progress of filter washing can be observed.