Moultrie, Colquitt County

Taqueria Don Chino's

821 B 1ST ST NE MOULTRIE, GA 31768

Food
Latest score
100
Jan 7, 2026
City
Moultrie
County
Colquitt
Inspections
5

Score history

Inspection scores over time for this facility.

Inspection history

Georgia inspection history is score-based, with violations grouped under each recorded inspection.

Jan 7, 2026

Routine

Score: 1000 violations
No violations recorded for this inspection.

Jun 26, 2025

Routine

Score: 1000 violations
No violations recorded for this inspection.

Sep 13, 2024

Routine

Score: 911 violation

6-1A - proper cold holding temperatures

Regulation: 511-6-1.04(6)(f) - time/temperature control for safety; cold holding (p)

9 ptsCorrected: YesRepeat: No

Observed chicken pork in RIF in base of operation that was stored in RIF on yesterday (9/13/24) tempting above 41 degrees Fahrenheit. CA: Except during preparation, cooking, or cooling, or when time is used as the public health control, time/temperature control for safety food shall be maintained at 41°F (5°C) or below or 135°F (57°C) or above, except that roasts cooked to a temperature and for a time specified in subsection (5)(a)2 of this Rule and reheated using the same temperature and time conditions as cooking may be held at a temperature of 130°F (54°C) or above. PIC discarded chicken pork that was tempting above 41 degrees Fahrenheit in RIF in base of operation.

Mar 12, 2024

Routine

Score: 981 violation

16A - hot and cold water available; adequate pressure

Regulation: 511-6-1.06(1)(g),(h) - water supply, capacity; pressure (pf)

2 ptsCorrected: NoRepeat: No

Observed no hot water in both restrooms in the base of operation. CA: Hot water generation and distribution systems shall be sufficient to meet the peak hot water demands throughout the food service establishment. PIC will have hot water repaired to working order in both restrooms.

Jul 25, 2023

Routine

Score: 955 violations

2-2D - adequate handwashing facilities supplied & accessible

Regulation: 511-6-1.07(3)(a) - handwashing cleanser, availability (pf)

4 ptsCorrected: NoRepeat: No

Observed no handwashing cleanser available in men's restroom and women's restroom in base of operation. PIC will have handwashing cleanser put in men's restroom and women's restroom in base of operation by today.

2-2D - adequate handwashing facilities supplied & accessible

Regulation: 511-6-1.07(3)(b) - hand drying provision (pf)

4 ptsCorrected: NoRepeat: No

Observed no disposable hand towels available at handwashing sinks in men's restroom and women's restroom in base of operation. PIC will put disposable hand towels at handwashing sinks in men's restroom and women's restroom in base of operation by today.

17C - physical facilities installed, maintained, and clean

Regulation: 511-6-1.07(2)(a) - floor, walls, & ceilings, cleanability (c)

1 ptsCorrected: NoRepeat: No

Observed crack in ceiling tile in dry storage area of base of operation. PIC will have until 08/15/2023 to have crack in ceiling tile in dry storage area of base of operation repaired.

17C - physical facilities installed, maintained, and clean

Regulation: 511-6-1.07(2)(a) - floor, walls, & ceilings, cleanability (c)

1 ptsCorrected: NoRepeat: No

Observed hole in ceiling tile in front of men's restroom. PIC will have until 08/15/2023 to have hole in ceiling tile in front of men's restroom repaired.

17D - adequate ventilation and lighting; designated areas used

Regulation: 511-6-1.07(2)(i) - light bulbs, protective shielding (c)

1 ptsCorrected: NoRepeat: No

Observed no protective shielding over light bulb in kitchen area of base of operation. PIC will have until 08/01/2023 to have protective shielding put over light bulb in kitchen area of base of operation.