Mar 18, 2026
Routine
17C - physical facilities installed, maintained, and clean
Regulation: 511-6-1.07(2)(a) - floor, walls, & ceilings, cleanability (c)
Observed a missing ceiling tile in the base of operation near the back exit door. CA: Except as specified under subsection (2)(d) of this Rule and except for antislip floor coverings or applications that may be used for safety reasons, floors, floor coverings, walls, wall coverings, and ceilings shall be designed, constructed, and installed so they are smooth and easily cleanable. PIC will put a ceiling tile in the ceiling in the base of operation near the back exit door.