Jun 15, 2026
Routine
6 - proper disinfectant level
13-189(c)(1) free chlorine residual shall be maintained at a concentration no less than 3 ppm. Observed: 2.95 ppm, corrected to 7.91 by maintenance man on site
19 - adequate turnover rate
13-205(b)(1) equipment shall be ran to ensure 1 turnover every 6 hours. Required flow is 94 GPM, observed flow was at 65 GPM
36 - daily recordkeeping: water testing and self inspection performed
13-202(c) each pool operator shall make available for inspection onsite a daily record of operating information. Observed: no chemical logs available for inspection
20 - return inlets maintained
13-190(a) return inlets must be maintained. Observed: the return inlet by the handrail is missing a cover