Jun 2, 2026
Routine
19 - adequate turnover rate
13-190(a): Equipment shall be operated continuously to obtain minimum number of required turnovers per day. Observed flow meter reading of 65 GPM. Required turnover of 6 hours or 77.7 GPM.
3001 LAVISTA RD DECATUR, GA 30033
Inspection scores over time for this facility.
Georgia inspection history is score-based, with violations grouped under each recorded inspection.
Routine
13-190(a): Equipment shall be operated continuously to obtain minimum number of required turnovers per day. Observed flow meter reading of 65 GPM. Required turnover of 6 hours or 77.7 GPM.
Permit/Opening
Filter backwash water and contaminated drainage disposed of properly. Observed backwash line water backing up into equipment room. Backwash is contained in equipment room and drains to sewer.
Permit/Opening
Routine
Routine
Permit/Opening
Routine
13-189(a)(5): all pools shall be kept free of sediment and debris. The pool surface needs to be cleaned because there is a little staining on it.
Routine